In-depth monitoring report construction and improvement of Nabinagor-Shibpur-Radhika regional highway project (R-203) (1st revised) Coordination and MIS Sector

By: Publication details: Dhaka: Implementation Monitoring and Evaluation Division (IMED), Ministry of Planning, 2024Edition: 1st edDescription: vi, 120p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 1 Available 7770
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
প্রভাব মূল্যায়ন প্রতিবেদন প্রান্তিক এবং ক্ষুদ্র কৃষকদের শস্য সংগ্রহ পরবতী সহযোগিতার মাধ্যমে দারিদ্র্য দুরীকরণ (১ম সংশোধিত) প্রকল্প In-depth monitoring report research, development and extension of cashewnut and coffee project নিবিড় পরিবীক্ষণ প্রতিবেদন বৃহত্তর ফরিদপুরের চরাঞ্চল এবং পার্শ্ববর্তী এলাকায় গবাদি পশুর জাত উন্নয়ন ও দুগ্ধের বহুমুখী ব্যবহার নিশ্চিতকরণ কারখানা স্থাপন (১ম সংশোধিত) প্রকল্প In-depth monitoring report construction and improvement of Nabinagor-Shibpur-Radhika regional highway project (R-203) (1st revised) Coordination and MIS Sector Impact evaluation report expansion of irrigation through utilization of surface water by double lifting-3rd phase (2nd revised) In-depth monitoring report reconstruction of Mymensingh central jail (1st revised) project. In-depth monitoring report "Pabna- Natore- Sirajganj district irrigation development through surface water project (1st revised)"

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.