In-depth monitoring report "Urban water supply and sanitation projects in 23 pourashavas in Bangladesh (GOB-IDB)(1st revised)"

By: Publication details: Dhaka: Implementation Monitoring and Evaluation Division (IMED), Ministry of Planning 2024Edition: 1stDescription: v, 184p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 1 Available 7739
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
নিবিড় পরিবীক্ষণ প্রতিবেদন "বাংলাদেশের ২৩ টি পৌরসভায় পানি সরবরাহ ও স্যানিটেশন প্রকল্প (পিওবি-আইডিবি) (১ম সংশোধিত)" In-depth monitoring report extension of upazila complex project (2nd phase) (1st rev) নিবিড় পরিবীক্ষণ প্রতিবেদন আরবান প্রাইমারী হেলথ কেয়ার সার্ভিসেস ডেলিভারী প্রকল্প (২য় পর্যায়) (১ম সংশোধিত) পরিবীক্ষণ ও মূল্যায়ন সেক্টর-৩ In-depth monitoring report "Urban water supply and sanitation projects in 23 pourashavas in Bangladesh (GOB-IDB)(1st revised)" নিবিড় পরিবীক্ষণ প্রতিবেদন জেলা পর্যায়ে আইটি/হাই টেক পার্ক স্থাপন (১২টি জেলায় ) (১ম সংশোধিত) নিবিড় পরিবীক্ষণ প্রতিবেদন উপজেলা কমপ্লেক্স সম্প্রসারণ (২য় পর্যায়) (১ম সংশোধিত) প্রকল্প প্রভাব মূল্যায়ন প্রতিবেদন ফরিদপুর মেডিকেল কলেজ ও হাসপাতাল স্থাপন শীর্ষক প্রকল্প (১ম সংশোধিত)

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.