In-depth monitoring report improvement of jaipurhat-(Hichmi)-Puran Aipaul-Panchbibi-Hilli (with city link) highway (1revised)

By: Publication details: Dhaka: Implementation Monitoring and Evaluation Division (IMED), Ministry of Planning 2024Edition: 1st edDescription: vi, 156p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 1 Available 7704
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
Impact evaluation report skills and training enhancement project (STEP) (3rd revised) বিবিড় পরিবীক্ষণ প্রতিবেদন “৪ লেনে উন্নীত ঢাকা-চট্রগ্রাম জাতীয় মহাসড়ক (এন-১) (দাউদকান্দি-চট্রগ্রাম অংশ) এর ৪ (চার) বছরের জন্য পারফরম্যান্স বেইজড অপারেশন ও দৃঢ়করণ (১ম সংশোধিত)” পরিবীক্ষণ ও মূল্যায়ন সেক্টর-০২ নিবিড় পরিবীক্ষণ প্রতিবেদন উপজেলা, ইউনিয়ন ও গ্রাম সড়কে অনূর্ধ্ব ১০০ মিটার সেতু নির্মাণ (১ম সংশোধিত ) প্রকল্প In-depth monitoring report improvement of jaipurhat-(Hichmi)-Puran Aipaul-Panchbibi-Hilli (with city link) highway (1revised) নিবিড় পরিবীক্ষণ প্রতিবেদন সারাদেশে পুকুর, খাল উন্নয়ন (২য় সংশোধিত) প্রকল্প নিবিড় পরিবীক্ষণ প্রতিবেদন জয়পুরহাট (হিচমী) পুরান আইপল-পাঁচবিবি-হিলি (শহর লিংকসহ) মহাসড়ক উন্নয়ন (১ম সংশোধিত) Impact evaluation report "Rehabilitation of Kalukhali-Bhatiapara section and construction of Kasiani-Gopalganj-Tungipara new rail line (1st revised)" complected project

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.