In-depth monitoring report "construction of 3rd & 4th dual gauge railway track between Dhaka-Tongi section and doubling of dual gauge track between Tongi-Joydebpur section including signaling works of Bangladesh Railway (1st revised)"

By: Contributor(s): Publication details: Dhaka: Implementation Monitoring and Evaluation Division, 2023Edition: 1st edDescription: viii, 123p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 625.18/IND/2023 (Browse shelf(Opens below)) 1 Available 7478
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
625.1/NIB/2018 নিবিড় পরিবীক্ষণ প্রতিবেদন কালুখালী- ভাটিয়াপাড়া সেকশন পুনর্বাসন এবং কাশিয়ানী - টুঙ্গীপাড়া ভায়া গোপালগঞ্জ নতুন ব্রডগেজ রেলপথ নির্মাণ প্রকল্প ( ২য় সংশোধিত) Provab mullayan proibedon Kalukhali-Bhatiapara section punarbashon & Kashiani-Gopalganj-Tungipara new broad-gauge rail line nirman (2nd revised) project] 625.1/NIB/2018 নিবিড় পরিবীক্ষণ প্রতিবেদন কালুখালী- ভাটিয়াপাড়া সেকশন পুনর্বাসন এবং কাশিয়ানী - টুঙ্গীপাড়া ভায়া গোপালগঞ্জ নতুন ব্রডগেজ রেলপথ নির্মাণ প্রকল্প ( ২য় সংশোধিত) Provab mullayan proibedon Kalukhali-Bhatiapara section punarbashon & Kashiani-Gopalganj-Tungipara new broad-gauge rail line nirman (2nd revised) project] 625.14/IMP Report of impact evaluation for "Construction of double line track from Tongi to Bhairab Bazar including signaling (3rd revised) completed project" 625.18/IND/2023 In-depth monitoring report "construction of 3rd & 4th dual gauge railway track between Dhaka-Tongi section and doubling of dual gauge track between Tongi-Joydebpur section including signaling works of Bangladesh Railway (1st revised)" 625.18/NIB/2023 নিবিড় পরিবীক্ষণ প্রতিবেদন "ঢাকা-টঙ্গী সেকশনে ৩য় ও ৪র্থ ডুয়েলগেজ লাইন এবং টঙ্গী-জয়দেবপুর সেকশনে ডুয়েলগেজ ডাবল লাইন নির্মাণ (১ম সংশোধিত)" 625.7/IMP/2022 Impact evaluation report construction of herring bone bond (HBB) road for sustainable rural earthen road (1st revised) 625.7/NIB/2012 জেলা সড়ক উন্নয়ন (ঢাকা জোন) শীর্ষক প্রকল্পের নিবিড় পরিবীক্ষণ( In depth monitoring) এর চূড়ান্ত প্রতিবেদন [Nibir Poribikkhan Protibedon Zila Sarak Unnayan (Dhaka Zone) Prakalpo]

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.