Indeth monitoring evaluation report "establishment of Nibas with 25 beded in 08 Sarkari Shishu pribar" project

By: Publication details: Dhaka: Implementation Monitoring and Evaluation Division (IMED), Ministry of Planning, 2023Edition: 1st edDescription: 94p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 1 Available 7588
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
In-depth monitoring report installation of solar photovoltaic system (SPVS) for supply of electricity in remote areas of CHTs region (2nd phase) In-depth monitoring report capacity building of 64 technical school and college under directorate of technical education নিবিড় পরিবীক্ষণ প্রতিবেদন পার্বত্য চট্টগ্রামের প্রত্যন্ত এলাকায় সোলার প্যানেল স্থাপনের মাধ্যমে বিদ্যুৎ সরবরাহ ( ২য় পর্যায় ) প্রকল্প Indeth monitoring evaluation report "establishment of Nibas with 25 beded in 08 Sarkari Shishu pribar" project নিবিড় পরিবীক্ষ প্রতিবেদন ছাতক সিমেন্ট কোম্পানি লি. এর উৎপাদন পদ্ধতি ওয়েট প্রসেস থেকে ড্রাই প্রসেস ও রূপান্তরকরণ In-depth monitoring report conversion of wet process to dry process of Chhatak cement company Ltd. In-depth monitoring report integrated rurual employment support project for poor women (IRESPPW) (phase-II)

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.