In-depth monitoring report "construction of town and union land office across the country (1st revised) project"

By: Contributor(s): Publication details: Dhaka: Implementation Monitoring and Evaluation Division (IMED), 2022Edition: 1st publishedDescription: vii, 109 pages: ill; 28 cmDDC classification:
  • 21 624 IND/2022
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 624/IND/2022 (Browse shelf(Opens below)) 1 Available 7096
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
622.334/IMP/2016 Impact study of compensation package for rehabilitating the affected people of Barapukuria Coal Mine (central part) 622.334/PRO/2016 প্রভাব মূল্যায়ন সমীক্ষা প্রতিবেদন কমপেন্সেশন প্যাকেজ ফর রিহ্যাবিলিটেটিং দ্য অ্যাফেকটেড পিপল অব বড়পুকুরিয়া কোল মাইন (সেন্ট্রাল পার্ট) [Provab Mullayan Protibedon compensation package for rehabilitating the affected people of Barapukuria Coal Mine (central part)] 624/IMP/2024 Impact evaluation report construction of flood shelters in flood-prone and river erosion areas (2nd phase) 624/IND/2022 In-depth monitoring report "construction of town and union land office across the country (1st revised) project" 624/IND/2024 In-depth monitoring report construction of flood shelter in flood-prone and river erosion areas (3rd phase) 624/IND/2024 In-depth monitoring report construction of administrative convention center at Khulna (2nd revised) project 624/NIB নিবিড় পরিবীক্ষণ প্রতিবেদন সমগ্র দেশে শহর ও ইউনিয়ন ভূমি অফিস নির্মাণ (১ম সংশোধিত) প্রকল্প

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.