Impact evaluation report construction of 2nd Bhairab and 2nd Titas Bridge with approach railway lines (1st revised)

By: Publication details: Dhaka: Ministry of Planning, 2022Edition: 1st editionDescription: 103p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 385.321/IMP/2022 (Browse shelf(Opens below)) 1 Available 7274
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
385.314/PRO/2019 "সৈয়দপুর রেলওয়ে কারখানা আধুনিকীকরণ (১ম সংশোধিত)" শীর্ষক প্রকল্পের প্রভাব মূল্যায়ন প্রতিবেদন [Syedpur Railway Karkhana Adhinikikaran (1st revised) Prakalper Provab Mullyan Protibedon] 385.314/PRO/2019 "সৈয়দপুর রেলওয়ে কারখানা আধুনিকীকরণ (১ম সংশোধিত)" শীর্ষক প্রকল্পের প্রভাব মূল্যায়ন প্রতিবেদন [Syedpur Railway Karkhana Adhinikikaran (1st revised) Prakalper Provab Mullyan Protibedon] 385.314/PRO/2019 "সৈয়দপুর রেলওয়ে কারখানা আধুনিকীকরণ (১ম সংশোধিত)" শীর্ষক প্রকল্পের প্রভাব মূল্যায়ন প্রতিবেদন [Syedpur Railway Karkhana Adhinikikaran (1st revised) Prakalper Provab Mullyan Protibedon] 385.321/IMP/2022 Impact evaluation report construction of 2nd Bhairab and 2nd Titas Bridge with approach railway lines (1st revised) 385.360687/AHI Interim evaluation report on procurement of 47 DE locomotives for Bangladesh Railway 385.360687/AHI Interim evaluation report on procurement of 47 de locomotives for Bangladesh railway 387.077095492/MOH বাংলাদেশের মাদাসা শিক্ষা

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.