In-depth monitoring report Matarbari 2 x600MW ultra super critical coal fired power project

By: Publication details: Dhaka: Ministry of Planning, 2021Edition: 1st editionDescription: 104p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 621.371/IND/2021 (Browse shelf(Opens below)) 1 Available 6556

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.