In-depth monitoring report construction of 15 Nos. 14 storied residential buildings at section-9, Mirpur, Dhaka (2nd phase)" project

By: Publication details: Dhaka: Implementation Monitoring and Evaluation Division, Ministry of Planning 2020Edition: 1st edDescription: vi,114p
Item type: Report
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 690.8/IND (Browse shelf(Opens below)) 1 Available 6507
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
690.593/NID/2020 In-depth monitoring report on development of Cox's Bazar airport (phase-1) (3rd revised) project 690.8/BHU ভূমিহীন ও অসচ্ছল মুুক্তিযোদ্ধাদের জন্য আবাসন নির্মাণ প্রকল্পের প্রভাব মূল্যায়ন সমীক্ষার চূড়ান্ত প্রতিবেদন 690.8/IMP Impact evaluation of construction of housing for landless and underprivileged Mukttjoddhas 690.8/IND In-depth monitoring report construction of 15 Nos. 14 storied residential buildings at section-9, Mirpur, Dhaka (2nd phase)" project 690.8/IND/2023 নিবিড় পরিবীক্ষণ প্রতিবেদন অসচ্ছল বীর মুক্তিযোদ্ধাদের জন্য আবাসন নির্মাণ প্রকল্প 690.8/IND/2023 In-depth monitoring report housing construction project for the insolvent freedom fighters 690.8/NIB/2021 নিবিড় পরিবীক্ষণ প্রতিবেদন ঢাকার মিরপুরস্থ ৯নং সেকশনে ১৫ টি ১৪ তলা বিশিষ্ট আবাসিক ফ্ল্যাট নির্মাণ (২য় পর্যায়) প্রকল্প

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.