In-depth monitoring report Padma multipurpose bridge construction project (2nd revised)

By: Publication details: Dhaka; Implementation Monitoring & Evaluation Division, 20Edition: 1stDescription: 191
Item type: Corporate Publication
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 624.2/IND (Browse shelf(Opens below)) 1 Available 6065
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
624.2/BAR বরিশাল-পটুয়াখালী সড়কে পায়রা নদীর উপর পায়রা সেতু (লবুখালী সেতু) নির্মাণ (২য় সংশোধিত) শীর্ষক চলমান প্রকল্পের নিবিড় পরিবীক্ষণ প্রতিবেদন 624.2/IMP/2022 Impact evaluation study report construction of 4-lane flyover at Bhulta on Dhaka- Sylhet national highway (2nd revised) 624.2/IMP/2023 Impact evaluation study report construction of bridges/culverts more or less 15 meters long on rural roads (revised) 624.2/IND In-depth monitoring report Padma multipurpose bridge construction project (2nd revised) 624.2/IND/2023 In-depth monitoring report construction of bridge/culvert up to 15m length in the rural roads (1st revised) project 624.2/IND/2023 In-depth monitoring study report construction of important bridges on rural roads (1st revised) project 624.2/NIB/2023 নিবিড় পরিবীক্ষণ প্রতিবেদন গ্রামীণ রাস্তায় ১৫ মিটার দৈর্ঘ্য পর্যন্ত সেতু/কালভার্ট নির্মাণ (১ম সংশোধিত) প্রকল্প [Nibir poribikkhan protibedon Grameen Rastai 15 meters long Setu/Culvert nirman (1st revised) prokolpa]

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.