In-depth monitoring report on the "rebabilitation and modernization of Ashuganj power station complex (Unit-3,4 & 5)" project

By: Publication details: Dhaka: Implementation Monitoring and Evaluation Division (IMED), Ministry of Planning 2010Edition: 1st edDescription: variousDDC classification:
  • 21 621.312 IND
Item type: Corporate Publication
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 621.312/IND (Browse shelf(Opens below)) 1 Available 3247
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
616.92/ABC করোনাকালে বাংলাদেশের সমাজ ও অর্থনতি 616,92/KNC করোনা ভাইরাস : প্রতিরোধ, সতর্কতা এবং ভ্যাকসিন, 621.2121/NIB নিবিড় পরিবীক্ষণ প্রতিবেদন বিদ্যুৎ বিতরণ ব্যবস্থা উন্নয়ন প্রকল্প,রাজশাহী জোন (১ম সংশোধনী) শীর্ষক প্রকল্প 621.312/IND In-depth monitoring report on the "rebabilitation and modernization of Ashuganj power station complex (Unit-3,4 & 5)" project 621.3121/IND/2018 In-depth monitoring report construction of new 132/33 KV and 33/11 KV substation under DPDC 621.3121/INT/2005 Intensive monitoring study report on construction of Tongi 80 MW Gas Turbine power station 621.3121/NIB/2018 নিবিড় পরিবীক্ষণ প্রতিবেদন কনস্ট্রাকশন অব নিউ ১৩২/৩৩ কেভি এ্যান্ড ৩৩/১১ সাব- স্টেশন আন্ডার ডিপিডিসি [Nibir Poribikkhan Protibedon Construction of new 132/33 KV and 33/11 Sub-station under DPDC]

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.