Impact evaluation study of upgrading and expanding distribution system in Gulshan circle

By: Contributor(s): Publication details: Dhaka: Implementation Monitoring and Evaluation Division (IMED), Ministry of Planning 2006Edition: 1st edDescription: 103p
Item type: Corporate Publication
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Current library Call number Copy number Status Date due Barcode
IMED Library IMED Library 621.38232/IMP/2016 (Browse shelf(Opens below)) 1 Available 4493
Browsing IMED Library shelves, Shelving location: IMED Library Close shelf browser (Hides shelf browser)
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
621.371/IND/2021 In-depth monitoring report Matarbari 2 x600MW ultra super critical coal fired power project 621.371/NIB/2021 নিবিড় পরিবীক্ষণ প্রতিবেদন মাতারবাড়ী ২x৬০০মেঃওঃ আল্ট্রা সুপার ক্রিটিক্যাল কোল ফায়ার্ড পাওয়ার প্রজেক্ট 621.38195/INI Introduction to computer architecture 621.38232/IMP/2016 Impact evaluation study of upgrading and expanding distribution system in Gulshan circle 621.38232/PRO/2016 প্রভাব মূল্যায়ন সমীক্ষা প্রতিবেদন আপগ্রেডিং এন্ড এক্সপ্যান্ডিং ডিস্ট্রিবিউশন সিস্টেম ইন গুলশান সার্কেল 621.38275/PRO/2023 প্রভাব মূল্যায়ন সমীক্ষা প্রতিবেদন উপজেলা পর্যায়ে অপটিক্যাল ফাইবার ক্যাবল নেটওয়ার্ক উন্নয়ন প্রকল্প (২য় সংশোধিত) 622.334/IMP/2016 Impact study of compensation package for rehabilitating the affected people of Barapukuria Coal Mine (central part)

There are no comments on this title.

to post a comment.

© All rights reserved, IMED, Dhaka-Bangladesh, Support by BUET.